Widening of Tai Po Road (Sha Tin Section) – Works Area

The existing Tai Po Road (Sha Tin Section) is an essential road linking Northeast New Territories with Kowloon and Tsuen Wan.

To cope with the continuous increase of traffic demand due to the existing, committed and planned developments, a section of about 1.1km of Tai Po Road (Sha Tin Section) between Fo Tan Road and Sha Tin Rural Committee Road will be widened from a dual-2 lane to dual-3 lane carriageway, together with other related traffic improvement and road reconstruction works will be required. At the same time, the installation of noise mitigation measures is proposed to minimize the traffic noise impact to the nearby residents.

AECOM Asia Company Limited (AECOM) has been appointed to undertake the design and construction in December 2015.