- Summarize the views collected; from Stage 1 Public Consultation and report preliminary findings;
- Introduce the currently proposed enhanced road widening scheme;
- Introduce the current noise mitigation measures and visual design options;
- Consult the public to further improve and optimize the enhanced road widening design
| 2014-03-16 19:00-21:00 | Sha Tin Town Hall Lecture Hall (1) |